Undisclosed HQ

Selangor

Undisclosed HQ

Designing an 18-metre clear-span roof with provision for future occupation.

The proposed four-storey headquarters by K2LD includes an event space beneath an 18 m clear-span roof. The structural design also allows the roof level to carry the loading required for a future office floor.

Allowing for future adaptation

The structure was assessed and designed for the loading of a potential future office floor, embedding adaptability in the initial structural scheme.

Integrating the feature structure

The engineering also accommodates a suspended steel stair supported from an approximately 4 m cantilevered corridor, atrium seating stairs and a V-shaped entrance column supporting transferred floor loads.

Client

Undisclosed

Architect

K2LD KL – Melbourne

Design and Build Contractor

Project Manager

Interior Designer

Years

2024–ongoing

Size

Approx. 45,000 ft²

Project Cost

Services

Structural engineering

Geotechnical engineering

Civil engineering

Project Status

Construction